INDEPENDENT TAB VERIFICATION, AL BATHA OFFICE TOWER

INDEPENDENT TAB VERIFICATION, AL BATHA OFFICE TOWER

TAB Verification | Commissioning | Independent HVAC Review

Sharjah, UAE | 2025

PROJECT AT A GLANCE

CLIENT
Verve Design
DURATION
7 days
SERVICE
Independent third-party TAB data review and verification
PROJECT FACTS
Office fit-out | Airside + waterside verification | ASHRAE 111 | CIBSE Code M | SMACNA
LOCATION
Sharjah, UAE
YEAR
2025

PROJECT  OVERVIEW

Following TAB activities for an office fit-out at Al Batha Office Tower, MCUBE Engineering Consultants was engaged to independently review and verify the reported HVAC balancing results. The objective was to provide a standards-referenced assessment separate from the specialist contractor’s own report.

THE REQUIREMENT

The project required an independent review of airflow, static-pressure and chilled-water balancing information, with verification against design intent and recognized TAB / commissioning guidance.

OUR SCOPE

  • Review of specialist TAB records against the available design drawings and equipment information.
  • Independent recalculation and verification of airside measurement data.
  • Review of chilled-water balancing information and hydronic performance data.
  • Benchmarking against ASHRAE 111, CIBSE Commissioning Code M and SMACNA TAB practices.
  • Preparation of an independent verification conclusion and prioritized follow-up recommendations.

OUR APPROACH

MCUBE reviewed the airside and waterside evidence as separate but connected systems. This prevented one system from being treated as the cause of another system’s performance concern and provided a clearer diagnostic pathway based on measured data and design criteria.

KEY TECHNICAL HIGHLIGHTS

THIRD-PARTY TAB
Independent review of contractor-reported balancing data.
AIRSIDE REVIEW
Verification of airflow and pressure measurement methodology.
HYDRONIC REVIEW
Independent review of chilled-water balancing information.
STANDARDS
ASHRAE 111, CIBSE Code M and SMACNA benchmarking.
ROOT-CAUSE METHOD
System-by-system diagnostic separation before recommendation.
CLOSE-OUT SUPPORT
Clear technical basis for targeted optimization and re-verification.

ENGINEERING VALUE

  • Independent, engineering-led delivery with clear technical accountability.
  • Structured coordination that reduces ambiguity between design intent and project execution.
  • Traceable review methodology using documented inputs, standards and project criteria.
  • Practical outputs developed to support construction, commissioning, retrofit or approval decisions as applicable.

RESULTS

MCUBE provided an independent, standards-referenced verification of the HVAC balancing information and a clear technical basis for targeted optimization, re-verification and project close-out.

 

About Us

In a region where performance, compliance, and carbon goals are converging, MCube Engineering Consultants was founded to fill a critical gap.

We deliver integrated, high-impact solutions across MEPF design, energy efficiency, sustainability, and smart building technologies.