AL TAWAIN MASTER VILLA BASEMENT HVAC

AL TAWAIN MASTER VILLA BASEMENT HVAC

HVAC Design | Chilled Water Engineering | Pipe Stress & Support Design

Al Tawain, Fujairah, UAE | 2025

PROJECT AT A GLANCE

CLIENT
Phileo PM Aircondition & Refrigeration Trading LLC
DURATION
15 days
SERVICE
Concept and detailed HVAC systems engineering
PROJECT FACTS
Basement HVAC design | ~500 m CHW route | P&ID + SLD | ASME B31.1 / AISC
LOCATION
Al Tawain, Fujairah, UAE
YEAR
2025

PROJECT OVERVIEW

The Al Tawain Master Villa project required a dedicated HVAC solution for the basement level together with engineering for a long chilled-water distribution route. MCUBE Engineering Consultants delivered the mechanical design package and specialist piping analysis required to move the system from concept through detailed design.

THE REQUIREMENT

The scope required cooling-load calculations, system selection, coordinated HVAC layouts and a specialist pipe-stress and support assessment for a long trench-routed chilled-water line, developed to recognized piping and structural standards.

OUR SCOPE

  • HVAC cooling-load calculations and equipment selection.
  • Equipment placement, chilled-water piping and ductwork layout development.
  • P&ID, general-arrangement and electrical single-line documentation associated with the HVAC design.
  • Pipe stress analysis for the external chilled-water distribution route.
  • Structural support design and engineering checks in accordance with ASME B31.1 and AISC principles.
  • Phased design issue from preliminary engineering through final documentation.

OUR APPROACH

MCUBE progressed the HVAC design and specialist piping analysis in parallel so that equipment selection, routing, stress behaviour and support requirements informed one another before final issue. This reduced the risk of treating pipe supports as a late-stage drafting exercise and integrated mechanical and structural considerations into the design workflow.

KEY TECHNICAL HIGHLIGHTS

FULL DESIGN CHAIN
Cooling load through equipment, piping, ducting and documentation.
LONG CHW ROUTE
Specialist engineering for an approximately 500 m trench-routed chilled-water line.
PIPE STRESS
Analysis of piping behaviour, reactions and support requirements.
CODE ALIGNMENT
ASME B31.1 and AISC-based engineering principles.
P&ID + SLD
Integrated mechanical and electrical design documentation.
PHASED DELIVERY
Preliminary and final design workstreams coordinated together.

ENGINEERING VALUE

  • Independent, engineering-led delivery with clear technical accountability.
  • Structured coordination that reduces ambiguity between design intent and project execution.
  • Traceable review methodology using documented inputs, standards and project criteria.
  • Practical outputs developed to support construction, commissioning, retrofit or approval decisions as applicable.

RESULTS

MCUBE delivered a coordinated HVAC design package combining system selection, layout and controls documentation with specialist pipe-stress and support engineering for the long chilled-water route.